For commuters navigating the bustling arteries of Central Israel, mid-February brings essential scheduling shifts that demand attention. As the nation continues to modernize its transit infrastructure to keep pace with a dynamic population, passengers relying on specific Egged and Kavim routes must adjust their travel plans to accommodate new logistical realities taking effect this week.

The Transit Brief

  • Permanent Adjustment: Starting February 12, 2026, Egged Line 264 will no longer serve the Raoul Wallenberg stop in Tel Aviv.
  • Ramla Roadworks: Infrastructure upgrades on Herzl Street will disrupt multiple Kavim lines from February 9–11, 2026.
  • Digital Vigilance: Commuters are urged to refresh transit apps to avoid outdated walking directions or missing bus stops.

Tel Aviv Connectivity: The Evolution of Egged Line 264

As Tel Aviv’s high-tech landscape evolves, so too does the transit network supporting it. Riders utilizing the popular route between Rishon LeZion and the Atidim business park must note a permanent adjustment to the schedule starting Thursday, February 12, 2026.

The specific modification concerns the segment near the Yarkon District HQ. According to updated operational data, the stop located at Raoul Wallenberg has been officially cancelled from the route. This change impacts a key access point for those commuting to the commercial and security hubs in the area. Passengers who typically disembark here or use this location as a transfer point must identify alternative stops immediately to ensure seamless travel between Rishon LeZion and North Tel Aviv.

Why is Ramla Seeing Temporary Transit Detours?

Infrastructure development is a constant sign of Israel’s growth, but it occasionally requires short-term patience from the public. In the historic city of Ramla, essential maintenance works on Herzl Street are prompting a brief but significant reorganization of local bus traffic.

From February 9 through February 11, 2026, the operator Kavim is instituting detours to accommodate works on this central thoroughfare. The impact is widespread, affecting lines 8, 11, 13, 28, 29, 150, 154, 239, 245, 461, and 454. During this three-day window, stops along the Herzl Street corridor may be bypassed, and walking distances to temporary boarding locations may increase. While temporary, these adjustments are crucial for maintaining the long-term viability of the city’s transport arteries.

Operator Affected Area Dates (2026) Nature of Change Key Impact
Egged Tel Aviv (Raoul Wallenberg) From Feb 12 (Indefinite) Stop Cancellation Line 264 will bypass Yarkon District HQ stop entirely.
Kavim Ramla (Herzl St.) Feb 9 – Feb 11 Temporary Rerouting Detours and stop changes for over 10 local lines due to roadworks.

Commuter Action Plan

  1. Verify Line 264 Routes: If you work near Raoul Wallenberg Street, locate the nearest alternative stop before Thursday morning.
  2. Monitor Ramla Schedules: For travel through Ramla between Feb 9–11, check real-time updates as physical signage may not reflect sudden detours.
  3. Update Travel Apps: Ensure your navigation software is not caching old data that lists the cancelled Yarkon District HQ stop.

Glossary

  • Egged: Israel’s largest transit bus operator, functioning as a primary connector between major cities like Rishon LeZion and Tel Aviv.
  • Kavim: A major public transport operator in Israel, responsible for many local and regional lines, including the Ramla cluster.
  • Atidim: A high-tech industrial park in North Tel Aviv, a common destination for commuters on Line 264.
  • Raoul Wallenberg Street: A major thoroughfare in Tel Aviv’s Ramat HaHayal neighborhood, named after the Swedish diplomat who saved Jews during the Holocaust.

Methodology

This report draws directly from operational updates released by transit authorities regarding schedule changes for February 2026. Data regarding specific line cancellations and temporary rerouting is based on official service bulletins from Egged and Kavim, as aggregated by transit intelligence platforms.

Frequently Asked Questions

Is the cancellation of the Raoul Wallenberg stop on Line 264 temporary?

No. The removal of the stop near the Yarkon District HQ is a permanent schedule change taking effect on February 12, 2026. Commuters should not expect this stop to return to the active roster in the near future.

Which specific lines are affected by the work in Ramla?

The infrastructure works on Herzl Street affect a broad range of Kavim lines. Specifically, routes 8, 11, 13, 28, 29, 150, 154, 239, 245, 461, and 454 will experience detours or stop changes.

When will bus service in Ramla return to normal?

The disruptions in Ramla are scheduled to conclude after February 11, 2026. Unless further delays are announced, standard routing along Herzl Street should resume promptly once the infrastructure work is cleared.

Adapt and Arrive

Israel’s transit map is a living entity, shifting to meet the needs of urban development and efficiency. By staying ahead of these updates—specifically the permanent shift in North Tel Aviv and the temporary works in Ramla—commuters can ensure their daily routine remains uninterrupted. Stay alert, check your routes, and travel safely.

Key Takeaways

  • Egged Line 264 permanently drops the Raoul Wallenberg stop on Feb 12.
  • Ramla Commuters face widespread detours on Herzl St from Feb 9–11.
  • Proactive Planning via updated digital listings is essential to avoid “ghost stops.”

Why We Care

Efficient public transportation is the backbone of Israel’s bustling economy and daily life. Staying informed about these changes minimizes disruption for the workforce and ensures that the nation’s rapid infrastructure development continues without leaving commuters behind. Whether it’s a permanent route optimization or temporary roadwork, these updates reflect a country constantly building toward a better, more connected future.