Before you sign with an architect or a builder in Israel, check them in the government registers: builders in the Registrar of Contractors’ register, architects and structural engineers in the Register of Engineers and Architects. Then get written quotes that price the same work, and pay only for stages your own supervisor has signed off. The check below searches the contractor register for you, in English.
Who do you need to hire?
Most projects need more than one professional, and each is checked in a different place.
| Professional | In Hebrew | What they do for you | Where to check them |
|---|---|---|---|
| Architect | אדריכל | Designs the building, prepares and submits the permit application, and can supervise the design on site. | Engineers and Architects Register |
| Structural engineer | מהנדס קונסטרוקציה (קונסטרוקטור) | Calculates the frame, foundations and any wall you want to remove, and signs the structural plans. | Engineers and Architects Register |
| Building contractor | קבלן בניין | Builds the house or the extension: frame, walls, roof and usually the finishes. | Contractor register, branch 100 or 130 |
| Renovation contractor | קבלן שיפוצים | Renovates inside an existing building without touching the structure. | Contractor register, branch 131 |
| Construction supervisor | מפקח בנייה | Checks the work and the bills for you, and signs off each stage before you pay. | Ask for their engineering or architecture registration |
| Licensed surveyor | מודד מוסמך | Measures the plot and the building for the permit and for registration. | List of licensed surveyors |
| Quantity surveyor | חשב כמויות | Writes the bill of quantities so builders price the same work, and checks their bills. | No public register |
| Interior designer | מעצב פנים | Plans layouts, materials and finishes. Not a substitute for an architect where a permit is needed. | No public register |
Which of them you need depends on the job.
| Project | Who you usually need |
|---|---|
| New floors, kitchen or bathroom, no walls moved | Renovation contractor; an interior designer if you want one |
| Removing or opening a wall | Structural engineer first, then a contractor; an architect if a permit is needed |
| Adding a room, a floor or a safe room (mamad) | Architect, structural engineer, surveyor and a registered contractor |
| Building a private house | Architect, structural engineer, surveyor, registered contractor and an independent supervisor |
| Building or renovating while you live abroad | All of the above, plus a supervisor or project manager who reports to you, not to the builder |
The exact professionals a permit calls for depend on the plan and the building, and the local planning committee has the final say. Ask your architect for the list in writing at the start.
How do I check that a builder is registered?
Building work in Israel above an amount set in regulations must be done by a contractor registered in the right branch, and work on a building’s structural frame needs a registered contractor whatever its size. The amount is linked to the building cost index and changes every 1 January. Search by the contractor number on the quote, the company number or the name.
Check a contractor or surveyor
Searches the government registers on data.gov.il. Type the contractor number from the quote, the 9-digit company number, or the name in Hebrew as registered.
The result shows the branches the contractor is registered in and the class in each. Nothing you type is stored.
Official registers: contractors, surveyors, engineers and architects.
Each line in the result is a branch: 100 is building, 130 is concrete frames, 131 is renovations. The class next to it is a letter and a number. Within a group, a higher number lets the contractor take on a larger single project, and class 5 has no limit. Make sure the name and company number on your contract match the register exactly; a related company with a similar name is a different contractor.
How do I check an architect or an engineer?
Architects and engineers are in the Register of Engineers and Architects at the Ministry of Labor. You can search by ID number, passport number, first or last name with the town, or certificate number. The result shows whether the person is registered or licensed, in which branch, and until when. A renewed license appears only after the fee is processed, so if it shows as expired, check again a month later or call the department on 074-7696660.
Look at the certificate type. “Registered” (rishum) comes first; “licensed” (rishuy) is the senior level, granted after the years of practice the law requires. Planning rules tie who may sign a permit application or structural plans to the type and size of the building, so ask which certificate your project needs and check that the person signing holds it.
How do architects and builders charge?
Fees vary with the size of the job and what is included, so compare the basis of each price and what it covers.
| Arrangement | Usually used for | What to pin down |
|---|---|---|
| Hourly | A first meeting, advice on a plot or a flat | How many hours, and what you get in writing at the end |
| Fixed fee per stage | Architects: design, permit, construction drawings, supervision | Exactly which drawings, how many design rounds, how many site visits |
| Percentage of the building cost | Architects and supervisors on larger projects | The fee rises with every extra; agree a cap or a fixed fee instead |
| Price per square metre | Builders, sometimes architects | Only comparable when the specification behind it is the same |
| Frame only (shell) | Builders: foundations, frame and roof | Everything after the frame is a second contract |
| Turnkey (mafteach) | Builders: the finished house | The specification list decides what "finished" means |
| Cost plus a margin | Builders, when the scope is unclear | You carry every overrun; you need someone checking each bill |
Ask at least three for a price on the same brief. A price per square metre or a percentage tells you nothing until you know what drawings, materials and visits stand behind it.
What should a quote include?
An architect’s quote should list the deliverables, not only a total.
| Item | What the quote should say |
|---|---|
| Building rights check | A written answer on what the plan allows on your plot, before design starts |
| Design options | How many options and how many rounds of changes are included |
| Permit application | Who prepares it, submits it and answers the local committee |
| Consultants | Which ones are included (structure, plumbing, electricity, safe room) and who pays them |
| Construction drawings | Detailed drawings the builder works from, not only the permit drawings |
| Bill of quantities | Included or priced separately |
| Site supervision | How many visits, and at which stages |
| Ownership of the drawings | That you may use them if you change architect |
A builder’s quote should follow a written specification: the same list of work and materials sent to every builder, ideally a bill of quantities. It should say whether VAT is included, what is excluded (demolition, waste removal, waterproofing, electricity, plumbing, windows and doors, finishes), the schedule, and how extra work is priced and approved. Once two quotes are in, put them side by side here.
Compare two builder quotes
Add what each quote leaves out (work you will have to pay someone for) and put both on the same VAT basis.
Comparable totals, including VAT
- Quote A
- ₪1,239,000
- Quote B
- ₪1,220,800
Quote B is ₪18,200 cheaper once both cover the same work.
Example figures; type your own. VAT 18% since 1 January 2025.
How should I pay a builder?
Pay for work once it is done, and write these protections into the contract.
| Protection | What it means |
|---|---|
| Stage payments | Each payment is tied to a stage you can see: foundations, frame, walls and roof, systems, finishes, handover. |
| Sign-off by your supervisor | Your own supervisor checks each stage and the bill before you pay it. |
| A guarantee for any advance | If the builder asks for money before work starts, ask for a bank guarantee (arvut bankait) for the same amount. |
| Written change orders | Extra work is priced and signed before it is done. |
| A retention until defects are fixed | Part of the last payment is held back until the defects list from the handover is closed. |
Keep every receipt and tax invoice in your name. You will need them if the build is financed, and again when you sell.
What are the warning signs?
Walk away, or slow down and check, when you see any of these.
| Warning sign | The risk |
|---|---|
| The registration belongs to someone else | You may be dealing with an unregistered builder working under another firm's license |
| A price far below the others | Work is missing from the quote and will come back as extras |
| A large payment before work starts | Money you may not get back if the builder stops |
| No written specification | Every material choice becomes an argument and an extra charge |
| Only a verbal agreement | Nothing to hold the builder to on price, dates or quality |
| The builder picks your supervisor | The person signing off the work answers to the builder, not to you |
| No insurance certificate | Damage to your property or to workers can fall on you |
| No references from similar jobs | You cannot check the quality of earlier work |
| An offer to skip the permit | Fines, demolition orders and trouble when you sell |
| No completion date in the contract | Delays with no remedy |
Hiring an English-speaking architect or building from abroad
Some architects and engineers in Israel work in English. The register does not record languages, so ask on the first call and check the person in the register like anyone else. The plans, the permit and the municipality’s letters will be in Hebrew whatever language you speak with your architect.
If you will not be in Israel during the work, set it up so that nothing depends on the builder’s word alone:
- A contract in Hebrew with an English translation you have read, and a clause saying which version decides.
- An independent supervisor or project manager who answers to you, not to the builder.
- Photo and video reports at every stage, before each payment.
- Payments approved by you in writing, against the supervisor’s sign-off.
- A limited power of attorney for one person, for set tasks only, with an end date.
- Materials and finishes chosen and approved in writing, with samples photographed.
What if something goes wrong?
Put every complaint in writing to the professional first and keep a copy. If that does not settle it:
| Problem | Where to turn |
|---|---|
| A registered contractor broke the rules or did faulty work | A complaint to the Registrar of Contractors at the Ministry of Construction and Housing |
| An architect or engineer acted unprofessionally | A complaint to the Registrar of Engineers and Architects at the Ministry of Labor (074-7696660) |
| A structural problem | An independent structural engineer's report, before anyone repairs it |
| Building without a permit next to you or on your property | The local planning and building committee of your city |
| Money owed, delays or a contract dispute | An Israeli lawyer who handles construction contracts |
A complaint to a registrar can lead to discipline. It does not get you compensation; for money, you need a lawyer or the courts.
Sources
- Registered Contractors Register (פנקס הקבלנים הרשומים), Ministry of Construction and Housing, data.gov.il, read live by the check above
- List of licensed surveyors (רשימת המודדים), Survey of Israel, data.gov.il, read live by the check above
- Register of Engineers and Architects (פנקס המהנדסים והאדריכלים), Ministry of Labor, public search
- Department for Registration and Licensing of Engineers and Architects, Ministry of Labor
- Contractors Registration Regulations (Monetary Scope and Professional Nature) 1984, text of the regulations
- VAT Order (Rate of Tax) Amendment, 18% from 1 January 2025 (Federation of Israeli Chambers of Commerce summary)
Checked 24 November 2026.
Common questions
Do I need a registered contractor for a renovation?
Above the amount set in regulations, yes, registered in the renovations branch (131) or a building branch, and for any work on the structural frame whatever its size. Below that, the law does not require it, but a registered contractor gives you a record and a registrar to complain to.
Is an interior designer enough to move walls?
No. Removing or opening a wall needs a structural engineer’s calculation, and where a permit is needed, an architect or engineer to prepare it.
How do I check a builder from the quote?
Take the contractor number or the company number from the quote and type it into the check above. Make sure the name matches the company you are signing with.
Can the builder supply the supervisor?
You can agree to it, but then the person checking the work is paid by the person doing it. An independent supervisor, hired and paid by you, protects you.
This is general information, not legal or tax advice; confirm with a licensed professional.
Semerenko Group is the English-first real estate platform for Israel. We combine property information, official market data and tools with representation, negotiation, mortgage and legal coordination, and property management for buyers, renters, sellers and investors.
Published by Semerenko Group under the professional supervision of licensed Israeli real-estate broker Pinhas Menachem Reiss (License #324150). We work with owners, brokers, brokerages and developers across Israel. This is general information, not legal or tax advice; confirm with a licensed professional.