Before you sign with an architect or a builder in Israel, check them in the government registers: builders in the Registrar of Contractors’ register, architects and structural engineers in the Register of Engineers and Architects. Then get written quotes that price the same work, and pay only for stages your own supervisor has signed off. The check below searches the contractor register for you, in English.

Who do you need to hire?

Most projects need more than one professional, and each is checked in a different place.

Who does what when you build or renovate in Israel
ProfessionalIn HebrewWhat they do for youWhere to check them
ArchitectאדריכלDesigns the building, prepares and submits the permit application, and can supervise the design on site.Engineers and Architects Register
Structural engineerמהנדס קונסטרוקציה (קונסטרוקטור)Calculates the frame, foundations and any wall you want to remove, and signs the structural plans.Engineers and Architects Register
Building contractorקבלן בנייןBuilds the house or the extension: frame, walls, roof and usually the finishes.Contractor register, branch 100 or 130
Renovation contractorקבלן שיפוציםRenovates inside an existing building without touching the structure.Contractor register, branch 131
Construction supervisorמפקח בנייהChecks the work and the bills for you, and signs off each stage before you pay.Ask for their engineering or architecture registration
Licensed surveyorמודד מוסמךMeasures the plot and the building for the permit and for registration.List of licensed surveyors
Quantity surveyorחשב כמויותWrites the bill of quantities so builders price the same work, and checks their bills.No public register
Interior designerמעצב פניםPlans layouts, materials and finishes. Not a substitute for an architect where a permit is needed.No public register
This table

Which of them you need depends on the job.

Who you need for each kind of project
ProjectWho you usually need
New floors, kitchen or bathroom, no walls movedRenovation contractor; an interior designer if you want one
Removing or opening a wallStructural engineer first, then a contractor; an architect if a permit is needed
Adding a room, a floor or a safe room (mamad)Architect, structural engineer, surveyor and a registered contractor
Building a private houseArchitect, structural engineer, surveyor, registered contractor and an independent supervisor
Building or renovating while you live abroadAll of the above, plus a supervisor or project manager who reports to you, not to the builder
This table

The exact professionals a permit calls for depend on the plan and the building, and the local planning committee has the final say. Ask your architect for the list in writing at the start.

How do I check that a builder is registered?

Building work in Israel above an amount set in regulations must be done by a contractor registered in the right branch, and work on a building’s structural frame needs a registered contractor whatever its size. The amount is linked to the building cost index and changes every 1 January. Search by the contractor number on the quote, the company number or the name.

Check a contractor or surveyor

Searches the government registers on data.gov.il. Type the contractor number from the quote, the 9-digit company number, or the name in Hebrew as registered.

The result shows the branches the contractor is registered in and the class in each. Nothing you type is stored.

Official registers: contractors, surveyors, engineers and architects.

Each line in the result is a branch: 100 is building, 130 is concrete frames, 131 is renovations. The class next to it is a letter and a number. Within a group, a higher number lets the contractor take on a larger single project, and class 5 has no limit. Make sure the name and company number on your contract match the register exactly; a related company with a similar name is a different contractor.

How do I check an architect or an engineer?

Architects and engineers are in the Register of Engineers and Architects at the Ministry of Labor. You can search by ID number, passport number, first or last name with the town, or certificate number. The result shows whether the person is registered or licensed, in which branch, and until when. A renewed license appears only after the fee is processed, so if it shows as expired, check again a month later or call the department on 074-7696660.

Look at the certificate type. “Registered” (rishum) comes first; “licensed” (rishuy) is the senior level, granted after the years of practice the law requires. Planning rules tie who may sign a permit application or structural plans to the type and size of the building, so ask which certificate your project needs and check that the person signing holds it.

How do architects and builders charge?

Fees vary with the size of the job and what is included, so compare the basis of each price and what it covers.

How architects and builders in Israel charge
ArrangementUsually used forWhat to pin down
HourlyA first meeting, advice on a plot or a flatHow many hours, and what you get in writing at the end
Fixed fee per stageArchitects: design, permit, construction drawings, supervisionExactly which drawings, how many design rounds, how many site visits
Percentage of the building costArchitects and supervisors on larger projectsThe fee rises with every extra; agree a cap or a fixed fee instead
Price per square metreBuilders, sometimes architectsOnly comparable when the specification behind it is the same
Frame only (shell)Builders: foundations, frame and roofEverything after the frame is a second contract
Turnkey (mafteach)Builders: the finished houseThe specification list decides what "finished" means
Cost plus a marginBuilders, when the scope is unclearYou carry every overrun; you need someone checking each bill
This table

Ask at least three for a price on the same brief. A price per square metre or a percentage tells you nothing until you know what drawings, materials and visits stand behind it.

What should a quote include?

An architect’s quote should list the deliverables, not only a total.

What an architect’s quote should say
ItemWhat the quote should say
Building rights checkA written answer on what the plan allows on your plot, before design starts
Design optionsHow many options and how many rounds of changes are included
Permit applicationWho prepares it, submits it and answers the local committee
ConsultantsWhich ones are included (structure, plumbing, electricity, safe room) and who pays them
Construction drawingsDetailed drawings the builder works from, not only the permit drawings
Bill of quantitiesIncluded or priced separately
Site supervisionHow many visits, and at which stages
Ownership of the drawingsThat you may use them if you change architect
This table

A builder’s quote should follow a written specification: the same list of work and materials sent to every builder, ideally a bill of quantities. It should say whether VAT is included, what is excluded (demolition, waste removal, waterproofing, electricity, plumbing, windows and doors, finishes), the schedule, and how extra work is priced and approved. Once two quotes are in, put them side by side here.

Compare two builder quotes

Add what each quote leaves out (work you will have to pay someone for) and put both on the same VAT basis.

Quote A
Quote B

Comparable totals, including VAT

Quote A
₪1,239,000
Quote B
₪1,220,800

Quote B is ₪18,200 cheaper once both cover the same work.

Example figures; type your own. VAT 18% since 1 January 2025.

How should I pay a builder?

Pay for work once it is done, and write these protections into the contract.

Payment protections to write into a building contract
ProtectionWhat it means
Stage paymentsEach payment is tied to a stage you can see: foundations, frame, walls and roof, systems, finishes, handover.
Sign-off by your supervisorYour own supervisor checks each stage and the bill before you pay it.
A guarantee for any advanceIf the builder asks for money before work starts, ask for a bank guarantee (arvut bankait) for the same amount.
Written change ordersExtra work is priced and signed before it is done.
A retention until defects are fixedPart of the last payment is held back until the defects list from the handover is closed.
This table

Keep every receipt and tax invoice in your name. You will need them if the build is financed, and again when you sell.

What are the warning signs?

Walk away, or slow down and check, when you see any of these.

Warning signs when hiring a builder
Warning signThe risk
The registration belongs to someone elseYou may be dealing with an unregistered builder working under another firm's license
A price far below the othersWork is missing from the quote and will come back as extras
A large payment before work startsMoney you may not get back if the builder stops
No written specificationEvery material choice becomes an argument and an extra charge
Only a verbal agreementNothing to hold the builder to on price, dates or quality
The builder picks your supervisorThe person signing off the work answers to the builder, not to you
No insurance certificateDamage to your property or to workers can fall on you
No references from similar jobsYou cannot check the quality of earlier work
An offer to skip the permitFines, demolition orders and trouble when you sell
No completion date in the contractDelays with no remedy
This table

Hiring an English-speaking architect or building from abroad

Some architects and engineers in Israel work in English. The register does not record languages, so ask on the first call and check the person in the register like anyone else. The plans, the permit and the municipality’s letters will be in Hebrew whatever language you speak with your architect.

If you will not be in Israel during the work, set it up so that nothing depends on the builder’s word alone:

  • A contract in Hebrew with an English translation you have read, and a clause saying which version decides.
  • An independent supervisor or project manager who answers to you, not to the builder.
  • Photo and video reports at every stage, before each payment.
  • Payments approved by you in writing, against the supervisor’s sign-off.
  • A limited power of attorney for one person, for set tasks only, with an end date.
  • Materials and finishes chosen and approved in writing, with samples photographed.

What if something goes wrong?

Put every complaint in writing to the professional first and keep a copy. If that does not settle it:

Where to turn when a building job goes wrong
ProblemWhere to turn
A registered contractor broke the rules or did faulty workA complaint to the Registrar of Contractors at the Ministry of Construction and Housing
An architect or engineer acted unprofessionallyA complaint to the Registrar of Engineers and Architects at the Ministry of Labor (074-7696660)
A structural problemAn independent structural engineer's report, before anyone repairs it
Building without a permit next to you or on your propertyThe local planning and building committee of your city
Money owed, delays or a contract disputeAn Israeli lawyer who handles construction contracts
This table

A complaint to a registrar can lead to discipline. It does not get you compensation; for money, you need a lawyer or the courts.

Sources

Checked 24 November 2026.

Common questions

Do I need a registered contractor for a renovation?

Above the amount set in regulations, yes, registered in the renovations branch (131) or a building branch, and for any work on the structural frame whatever its size. Below that, the law does not require it, but a registered contractor gives you a record and a registrar to complain to.

Is an interior designer enough to move walls?

No. Removing or opening a wall needs a structural engineer’s calculation, and where a permit is needed, an architect or engineer to prepare it.

How do I check a builder from the quote?

Take the contractor number or the company number from the quote and type it into the check above. Make sure the name matches the company you are signing with.

Can the builder supply the supervisor?

You can agree to it, but then the person checking the work is paid by the person doing it. An independent supervisor, hired and paid by you, protects you.

This is general information, not legal or tax advice; confirm with a licensed professional.

Written by Chaim Semerenko and the Semerenko Group team
Founder and CEO, Semerenko Group

Semerenko Group is the English-first real estate platform for Israel. We combine property information, official market data and tools with representation, negotiation, mortgage and legal coordination, and property management for buyers, renters, sellers and investors.

Published by Semerenko Group under the professional supervision of licensed Israeli real-estate broker Pinhas Menachem Reiss (License #324150). We work with owners, brokers, brokerages and developers across Israel. This is general information, not legal or tax advice; confirm with a licensed professional.

X  ·  Facebook  ·  Instagram  ·  LinkedIn  ·  YouTube

About Semerenko Group  ·  How we get paid