Julie, Herzl 91, Tel Aviv project rendering 1
New apartments at Herzl 91

Julie

LocationHerzl 91, Tel Aviv

Live at the centre of south Tel Aviv in a 152-home development with a resident rooftop, courtyard and shared spaces on every floor.

Project typeResidential
LocationTel Aviv
Why consider itCentral Herzl Street setting
Explore the project
StatusCurrent handover and availability require confirmation
On siteDeveloper material reviewed 21 August 2026
Expected deliverySupplied material states contractual occupancy in December 2026; confirm current status

Compare 30 supplied residences.

Confirm current availability

Open a residence page for its supplied measurements, price or plan. These records are organised from the material reviewed for Julie and must be reconfirmed before you rely on them.

Prices, availability, measurements, plan revisions, parking and delivery status must be confirmed with Semerenko Group before relying on them.

Watch the project.

Play the project video below.

For current availability and specifications, contact our team.

A complete residential setting at Herzl 91

Julie is described as a nine-storey, 152-home complex above street-level retail, planned around an internal garden and resident spaces that extend daily life beyond each apartment.

Resident spaces from the courtyard to the roof

The supplied material describes a floor-eight rooftop with a shallow pool, seating, yoga and views, together with two reinforced communal rooms of about 45 m² on every floor for uses such as fitness, work, lounge and laundry.

  • Internal landscaped garden
  • Resident rooftop and shallow pool
  • Flexible shared spaces on every floor
  • Four lifts serving the development

Comfort systems included in the supplied specification

The apartment specification describes VRF air conditioning, smart electrical systems, double glazing and electric blinds. Exact inclusions must be checked against the current sale specification for the chosen home.

  • VRF air conditioning
  • Smart electrical system
  • Double glazing
  • Electric blinds

Confirm the current commercial terms before relying on them

The supplied sales information describes a 70/30 payment structure, an exemption from the construction index and contractual occupancy in December 2026. Current terms, financing conditions, availability and handover status must be reconfirmed with Semerenko Group.

  • 70/30 structure in supplied material
  • Construction-index exemption in supplied material
  • Bank financing described
  • Independent legal review recommended

A delivery date needs a trail of evidence.

Published planning, permit, construction, and delivery milestones.

01
Project statusChecked 2026-08-21
02
Current construction stageChecked 2026-08-21
03
Expected deliveryChecked 2026-08-21

The developer behind the project.

Developer

Yuvalim Group and CityBoy

Which Julie residence fits your plans?

Compare apartment number, floor, interior and outdoor area, outlook and the supplied price before requesting current confirmation.

01Central Herzl Street setting
02Shared resident spaces and rooftop
03Apartment records with supplied prices
Project-specific follow-up

Get details for this project.

Stay on this page and answer one question at a time. Your request is saved with the project name and exact listing URL.

01 Choose what you need 02 Add your contact details 03 Tell us budget, timing & purpose
WhatsAppCallChat