Vatmal Preferred Housing Compounds: Declaration and Objections

Find My Israel Property Now
30-second inquiry · No obligation
Table of Contents

The Vatmal (ותמ”ל) is Israel’s national committee for preferred housing compounds: it approves very large housing plans in a single national body, on land the government has first declared a “preferred housing compound” (מתחם מועדף לדיור, mitcham muadaf ledior). It was created by a temporary law passed in August 2014, the Knesset extended that law by one more year in July 2026, and at that point the government said the committee was advancing about 228,000 homes across Israel. On 28 June 2026 the government declared or enlarged 18 compounds with about 47,000 planned homes. Keep one rule in mind when you read about any of them: a declaration is the start of planning, not a permit. Homes come only after a plan is deposited, heard, approved, marketed and built.

This guide explains what the Vatmal does, how a compound gets declared and by whom, what a declaration means if you are buying or own a flat nearby, which compounds were declared in June 2026, which Vatmal plans are moving now, and how to file an objection to a deposited plan. Figures come from government decisions and from Planning Administration (מינהל התכנון), Ministry of Construction and Housing and Israel Land Authority releases on gov.il, checked on 29 October 2026.

What the Vatmal is

The committee’s full name is the National Committee for Planning and Building of Preferred Housing Compounds. It was set up by the Law for the Promotion of Construction in Preferred Housing Compounds (Temporary Provision), 5774-2014 (חוק לקידום הבנייה במתחמים מועדפים לדיור (הוראת שעה), התשע”ד-2014), to approve large residential plans on a tight timetable as one of the government’s tools against the housing shortage. According to the Ministry of Construction and Housing, it works on a “one plan in one committee” basis and holds most of the powers of the National Council for Planning and Building. In practice a big housing plan is decided by one national body instead of moving from a local committee to a district committee.

The plans it approves are called preferred housing plans (תמ”ל, TAMAL, so plan numbers look like תמל/1126, written TAMAL 1126 in English). The Planning Administration’s glossary describes them as detailed residential plans on a large scale, on land the government or a ministerial committee declared a preferred housing compound, with provisions that allow building permits to be issued under them without any further plan. Our guide to zoning laws in Israel shows where these plans sit in the planning hierarchy.

The name is changing in practice. The deposit notice for a Ramla plan published in October 2026 calls the body the Committee for Preferred Housing Compounds and Public-Transport-Oriented Development (הוועדה למתחמים מועדפים לדיור ולפיתוח מוטה תחבורה ציבורית). The sources we read do not say whether its legal remit changed with the name, so treat the old and new names as the same committee.

Its weight is easy to see in the numbers. In its summary of 2025 the Planning Administration reported more homes approved in Vatmal plans than in any one of the six planning districts:

Housing units approved in plans in 2025, by planning body, Israel (total 223,164 homes)
The Vatmal (national)63,427 homes
Southern District27,478 homes
Jerusalem District27,079 homes
Central District26,686 homes
Haifa District20,558 homes
Northern District18,223 homes
Tel Aviv District14,459 homes

Source: Planning Administration, summary of 2025, published 1 January 2026, checked 29 Oct 2026. Homes approved in plans, not building permits or finished homes.

How a compound gets declared, and who may submit a plan

Before anyone can submit a preferred housing plan, the government, or a ministerial committee it appoints, has to declare the land a preferred housing compound. The declaration is made on the recommendation of the Planning Administration. In the June 2026 batch, each government decision named the section of the law it relied on, the compound’s area in dunam (1 dunam is 1,000 sqm), the existing and planned homes, and the date of the recommendation behind it. The Gedera West decision instead followed the recommendation of the advisory team defined in section 3(d) of the law.

  1. Recommendation. The director of the Planning Administration recommends the compound, its boundaries and an approximate number of homes.
  2. Declaration. The government or a ministerial committee declares the land a preferred housing compound in a numbered government decision. Enlargements are made by amending that decision, as several were in June 2026.
  3. Plan preparation. An authorised body draws up the preferred housing plan for the compound, usually with the local authority.
  4. Approval for deposit and deposit. The Vatmal decides the plan can be deposited. The plan is then published and anyone may object within the objection period.
  5. Objections and approval. The committee hears the objections and approves the plan, with or without changes. Building permits can then be issued under it.

Only these bodies may submit a preferred housing plan: the Israel Land Authority (ILA), the Ministry of Construction and Housing, the Government Company for Rental Housing, the Interior Ministry in minority localities, or anyone authorised under the law. So a private developer or a group of owners cannot file one unless they hold that authorisation.

The Planning Administration also publishes a list of declared Vatmal compounds. The version we read, updated 26 April 2026 and so before the June declarations, lists more than 200 compounds under five declaration tracks: land that is mainly state land (קרקע שעיקרה מקרקעי ישראל), Arab localities, Pinui Binui (evacuate and rebuild), land with many owners (קרקע מרובת בעלים) and metro. Matching the June 2026 decisions to that list, new neighbourhoods on mainly state land were declared under section 3(a)(1), renewal compounds under section 3(a)(3), and Gedera West, which the list shows as land with many owners, under section 3(a)(4). That matching is our reading of the documents; the law text sets the exact definitions.

What a declaration does and does not mean for buyers and owners

  • Declared is not deposited, approved or permitted. A declaration lets plans in the compound move through the Vatmal’s dedicated track. It does not approve a plan, grant building rights or start construction. A deposited plan can still change after objections, and only an approved plan supports building permits.
  • Home counts are approximate. Every June 2026 decision gives “about” figures and says the final number of homes will be set in detailed planning. Read them as the scale the government is aiming for, not a promise.
  • Dates are estimates. When the ILA says homes in a compound are expected to be occupied in a given year, that is a target set before any plan was deposited.
  • Renewal compounds affect existing owners. Fourteen of the 18 June 2026 compounds are urban renewal compounds with homes already standing in them. A Vatmal plan can include reparcellation (איחוד וחלוקה) without the consent of all owners, as the Ramla TAMAL 2055/A notice states, so owners should read the plan documents and file objections in time. Our guide to how Pinui Binui compounds are declared, approved and funded covers the separate renewal statuses, owners’ options and the tax and subsidy rules.
  • Affordable housing shares are set compound by compound. In Be’er Sheva’s Nofei HaNahal compound, for example, the decision sets affordable homes on ILA land at 15% of the homes, half of them for long-term rental at a reduced price. That is a rule for that compound, not a national rate.
  • Check the stage yourself. If a seller or developer says a neighbourhood is “Vatmal approved”, look up the plan number on MAVAT (mavat.iplan.gov.il), the Planning Administration’s plan information site, and confirm the stage and the date.

Compounds declared or enlarged on 28 June 2026

On 28 June 2026 the government adopted decisions 4287 to 4295, declaring new preferred housing compounds and enlarging existing ones. The government’s announcement put the total at about 47,000 homes: about 22,000 in urban renewal tracks and about 25,000 in new construction. Adding up the figures in the nine decisions gives about 47,130 planned homes (our calculation): about 22,130 in 14 renewal compounds and about 25,000 in four new-land compounds, compared with about 4,478 homes standing today in the compounds that state a count. Several compounds were enlarged rather than newly declared, so part of that capacity was declared earlier; the total is not 47,130 new approvals. On the same day the government also declared four war-damage rehabilitation areas under a different law, which our guide to the war-damage rebuilding law covers.

Urban renewal compounds (section 3(a)(3)) declared or enlarged on 28 June 2026, area in dunam and homes
City and compound Government decision Area (dunam) Homes now Homes planned Notes
Rehovot, Kfar Gvirol 4287 (new) About 71 About 413 About 2,075 homes Central Israel
Ashkelon, Gideon Ben Yoash 4287 (new) About 39 About 285 About 1,250 homes
Ashkelon, Givati Bar Kochba 4287 (new) About 60 About 508 About 1,440 homes
Ashkelon, S.Y. Agnon 4287 (new) About 48 About 208 About 1,254 homes
Ashkelon, Histadrut HaPortzim 4287 (new) About 39 About 342 About 2,058 homes
Ashkelon, Histadrut-Ben Gurion 4294 (enlarged; first declared by decision 1365, 1 Feb 2024) About 80 (added about 16) 425 About 2,650 homes ILA plan with the municipality; the ILA release cites about 2,800 new homes
Shlomi, Dado 4287 (new) About 57 About 188 About 689 homes Northern border town
Rechasim, Giv’a B 4287 (new) About 83 About 496 About 1,236 homes
Karmiel, Mordot HaRakevet 4288 (new) About 555 508 About 4,000 homes Led by the Ministry of Construction and Housing, around the train station
Be’er Sheva, Western Quarter (Rova Maaravi) of Nofei HaNahal 4289 (new) About 847 About 320 About 600 homes
Tiberias, HaMeginim 4292 (enlarged; first declared by decision 2123, 8 Aug 2024) About 71 (was about 29) 195 About 1,064 homes
Kiryat Shmona, Henrietta Szold 4292 (enlarged; decision 2123, 8 Aug 2024) About 106.5 (was about 70) 283 About 1,269 homes
Kiryat Shmona, Raziel 4292 (enlarged; decision 3112, 5 Jun 2025) About 99 (was about 82) 198 About 1,045 homes The decision prints this paragraph twice; we use the copy with Raziel’s own figures
Nahariya, Central Station 4292 (enlarged; decision 2123, 8 Aug 2024) About 191 (was 80) 109 About 1,500 homes

Source: Government decisions 4287, 4288, 4289, 4292 and 4294 of 28 June 2026, and the Ministry of Construction and Housing release of the same day (Karmiel), gov.il, checked 29 Oct 2026. For enlarged compounds, homes planned are the totals after enlargement. All counts are approximate and set in detailed planning.

New-land compounds declared or enlarged on 28 June 2026, area in dunam and homes
City and compound Government decision and section Area (dunam) Homes now Homes planned Notes
Be’er Sheva, Nofei HaNahal 4290 (new), section 3(a)(1) About 3,224 Not stated About 5,000 homes Planned and submitted by the Ministry of Construction and Housing; 15% affordable homes on ILA land, half for long-term rent at a reduced price
Beit Shemesh, Mitcham Tet (Compound 9) 4291 (new), section 3(a)(1) About 1,327 Not stated About 5,000 homes Adapted to the Haredi population; planned and submitted by the ILA; the Vatmal holds the TAMA 35 approval powers for the compound
Karmiel, Tzuf Kamon 4293 (enlarged; first declared by decision 1366, 1 Feb 2024), section 3(a)(1) About 3,419 (added about 919) Not stated About 7,000 homes Enlarged for continuity with the old town and gentler slopes
Gedera, Gedera West 4295 (enlarged; first declared by decision 1367, 1 Feb 2024), section 3(a)(4) About 3,034 (added about 1,844) Not stated About 8,000 homes Uses state land to add homes in central Israel while keeping continuity with the old town

Source: Government decisions 4290, 4291, 4293 and 4295 of 28 June 2026, gov.il, checked 29 Oct 2026.

Beit Shemesh, Mitcham Tet. The ILA describes the compound as lying in the east of Beit Shemesh, south of Moshav Zanoah and north and east of the slopes of the Givat HaMishkafayim and Ramat HaTannaim neighbourhoods. The plan is for a new neighbourhood with employment, commerce, public buildings and open space. A light rail line is planned to its east as part of the “Jerusalem 2050” mass-transit network; it is planned, not built. The site also includes drainage basins of the Zanoah, Yimla and Yishai streams and heritage areas with antiquities. The ILA gives 2033 as the expected occupancy year, an estimate made before any plan was deposited.

Ashkelon, Histadrut-Ben Gurion. This Pinui Binui compound runs along Ben Gurion Street between Bialik and HaHistadrut streets in the south of the city. The ILA and Ashkelon municipality plan to demolish about 425 homes, some in poor physical condition, and replace them with a mix of homes in buildings of up to 10 floors and towers of up to 31 floors, with shops along Ben Gurion Street, kindergartens, day-care centres and synagogues, open space that keeps valuable trees, and a better street and path network.

Officials framed the June batch as a renewal and periphery push. The Vatmal’s planner said most of the declared compounds focus on urban renewal and on strengthening the periphery, especially towns in the north and south, and the Planning Administration’s director general said the war had shown the need to speed up renewal so residents can live in new homes with a safe room (ממ”ד, mamad).

Vatmal plans in the pipeline: four examples

Declarations are only the first step. These four plans show the later stages. For more plans by city, see our trackers of new neighbourhood plans in central Israel and urban renewal projects by city.

Four Vatmal plans and their stage, as announced on gov.il, 2026
Plan Stage and date Homes What else is in it
Ramla, TAMAL 2055/A, urban transport centre Deposited for objections (notice published 22 Oct 2026) About 1,000 homes About 251,700 sqm of employment and commerce around the meeting point of mass-transit stations; provisions for an alternative staging site for Metro line M1, the route and station of light rail line 72B, and a pedestrian and micromobility bridge over the railway and Route 44 to north Ramla
Kiryat Shmona, TAMAL 1126 HaSha’ar HaDromi (South Gate) Published for deposit (ILA release, 17 May 2026) About 2,550 homes About 1,800 dunam in the south-east of the city; about 150 dunam for public buildings, about 640,000 sqm of employment, about 24,000 sqm of commerce, a national railway station with a transport centre and about 500 dunam of park and open space
Ashdod, Gdot HaNachal Approved for deposit by the Vatmal, 18 Mar 2026 About 2,000 homes, including about 600 small units About 400 dunam in the old Kiryat Haluzim employment area in the east of the city; 9-floor buildings with shop and public frontages, designed for the Haredi community
Lod, Lod South B, TAMAL 2053 In force: validity granted in December, per a release of 10 Feb 2026 6,392 homes, all new, including 1,200 small and very small units About 1,120 dunam either side of the railway; 159,000 sqm of employment and commerce; demolition of about 875 existing homes; new buildings of up to 30 floors

Sources: Planning Administration deposit notice, TAMAL 2055/A; ILA, South Gate plan; ILA, Gdot HaNachal plan; Ministry of Construction and Housing, Lod South B. Checked 29 Oct 2026.

The South Gate station is meant to be the terminus of the planned Karmiel to Kiryat Shmona railway, and the plan puts foodtech and logistics buildings in the employment zone and a park where the Zahav and Iyon streams meet; a new hospital and emergency centre are planned nearby. None of these has a date in the source. In Ashdod, Gdot HaNachal is the first stage of “Ashdod East” and of the ILA’s “Agricultural Triangle” skeleton plan, linked to moving the IAI Elta plant to the south of the city, and it sits by the Bnei Brit axis that is planned as part of a future Ashkelon-Ashdod mass-transit network. In Lod, the plan centres on Yoseftal Street, with a new public-transport terminal by Lod station, links across the railway, clearance of the Delkol factory site for housing, renewal of the Vardeh and historic Rakevet neighbourhoods, and denser building around a proposed metro station.

One caution if you search for Vatmal plans yourself: the Ministry of Construction and Housing’s list of Vatmal plans on gov.il was last updated on 22 October 2023, covers only some plans, and in places shows an approval date earlier than the deposit date (for example Ofakim, TAMAL 1027). Use MAVAT for any plan’s current stage.

How to object to a deposited Vatmal plan

Any person may file an objection to a deposited preferred housing plan. The rules below are as printed in the Vatmal’s deposit notice for Ramla’s TAMAL 2055/A (22 October 2026), issued under section 15 of the 2014 law and section 89 of the Planning and Building Law. Check the notice for your own plan, because the deadline is set plan by plan.

  1. Read the plan. Deposited documents are published on the Planning Administration website and on the submitting body’s website. You can also read them in person at the Vatmal offices, Beit HaDfus 12, Givat Shaul, Jerusalem, and at the local planning committee, during their opening hours.
  2. Work out your deadline. You have 60 days from the latest of three publications: the last sign posted on the site, the last newspaper notice, and the notice on the Planning Administration website. The plan’s page on MAVAT shows the publication dates.
  3. Write the objection. It must be in writing, give detailed reasons and come with an affidavit (תצהיר, tatzhir) verifying the facts it relies on. Otherwise it is not accepted or heard.
  4. File it. Use the objection form on MAVAT (mavat.iplan.gov.il), send it in writing to the Vatmal offices, use the “submit objection” button on the Vatmal’s website, or email the address printed in the plan’s notice. No hard copy is required.
  5. Confirm receipt. Call 074-7578264 to check that your objection arrived.

The objection file is open to the public, so leave out personal details you do not want published. If you are weighing an objection as an owner in a renewal compound, it usually pays to have a planning lawyer or appraiser read the plan’s provisions and reparcellation tables first.

This is general information, not legal or tax advice; confirm with a licensed professional.

Why the 2026 extension matters

Because the Vatmal was created as a temporary provision, it keeps working only while the Knesset renews the law. The Knesset approved a one-year extension in July 2026 (government release of 19 July 2026). The Planning Administration’s director general said the committee had then been operating for 12 years and that he hoped legislation to turn it from a temporary provision into a permanent committee would be completed soon. The government said the Vatmal was advancing about 228,000 homes, aimed first at the northern confrontation-line towns, including Kiryat Shmona, Tiberias and the Haifa Bay towns, and the southern cities of Ashkelon and Netivot, alongside tens of thousands of Pinui Binui homes in city centres. We have not yet read the published amendment, so we do not state the new end date; check it in the law before you rely on any Vatmal timetable.

Frequently asked questions

Is a preferred housing compound the same as an approved plan?

No. The compound is the land the government has opened to the Vatmal track. A plan for it still has to be prepared, deposited, heard and approved, and only then can building permits be issued.

Can a private developer bring a plan to the Vatmal?

Not directly. Plans are submitted by the ILA, the Ministry of Construction and Housing, the Government Company for Rental Housing, the Interior Ministry in minority localities, or a body authorised under the law.

How long do I have to object?

The deposit notices give 60 days from the latest publication of the deposit (sign on the site, newspaper or Planning Administration website). The date therefore differs for each plan.

Does the Vatmal handle urban renewal?

Yes. Fourteen of the 18 compounds declared or enlarged on 28 June 2026 are urban renewal compounds, in Ashkelon, Rehovot, Shlomi, Rechasim, Karmiel, Be’er Sheva, Tiberias, Kiryat Shmona and Nahariya.

Where do I check a plan’s current stage?

On MAVAT (mavat.iplan.gov.il), by the plan number, for example תמל/1126. It shows the stage, the publication dates and the documents.

Sources

  1. Ministry of Construction and Housing, plans of the national committee for preferred housing compounds (Vatmal), page updated 22 October 2023.
  2. Planning Administration, glossary of planning terms (Vatmal, deposit, objections).
  3. Planning Administration, list of declared Vatmal compounds, updated 26 April 2026.
  4. Planning Administration, summary of 2025, 1 January 2026.
  5. Government release on the Knesset approval of the Vatmal law extension, 19 July 2026.
  6. Ministry of Construction and Housing, 18 compounds and declaration amendments approved, 28 June 2026.
  7. Israel Land Authority, Beit Shemesh Mitcham Tet and Ashkelon Histadrut-Ben Gurion compounds, 28 June 2026.
  8. Government decision 4287, 28 June 2026.
  9. Government decision 4288, 28 June 2026.
  10. Government decision 4289, 28 June 2026.
  11. Government decision 4290, 28 June 2026.
  12. Government decision 4291, 28 June 2026.
  13. Government decision 4292, 28 June 2026.
  14. Government decision 4293, 28 June 2026.
  15. Government decision 4294, 28 June 2026.
  16. Government decision 4295, 28 June 2026.
  17. Planning Administration, deposit notice for preferred housing plan TAMAL 2055/A, Ramla, 22 October 2026.
  18. Israel Land Authority, South Gate plan TAMAL 1126, Kiryat Shmona, published for deposit, 17 May 2026.
  19. Israel Land Authority, Gdot HaNachal plan, Ashdod, approved for deposit, 18 March 2026.
  20. Ministry of Construction and Housing, Lod South B plan TAMAL 2053, 10 February 2026.

Looking at a new-build home or an older flat near one of these compounds? Send Semerenko Group your buyer brief with your budget, the cities you are considering and your timing, and we will check the plan’s real stage on MAVAT, tell you what is actually for sale now, and what the declaration means for the price and the wait.

Semerenko Group will use your details only to answer this inquiry through the channel(s) you provide. Privacy Policy · Terms
Privacy detailsSemerenko Group is the controller. Providing details is voluntary; without a contact method we cannot reply. Relevant agents, developers or service providers may receive them where needed to answer or match your request. For access or correction, email hello@semerenkogroup.com or see our Privacy Policy.